Birmingham, AL · Sidewalk Repair

Sidewalk Repair in Birmingham, AL: Who Pays?

Who pays?

Birmingham: the code tells the owner to repair a broken sidewalk within 10 days of the City Engineer's notice, but the City's Public Works Construction Division says it maintains and repairs City sidewalks, and the City has put money into sidewalk repairs. Report it through 311 before you hire anyone.

Moderate confidence · Verified Oct 3, 2026 · 5 sources

Corrected Oct 3, 2026: Verdict changed from owner to "it depends": the City's Public Works says it maintains and repairs City sidewalks and has funded sidewalk repairs. The earlier answer relied on the ordinance text alone. All corrections

Exception
  • The City's pages do not say whether it still bills owners for sidewalk repairs. Ask through 311 first.
What to do next

What to do next

  1. Check with Birmingham before you hire anyone

    Department of Public Works

    Call (205) 254-6316Official page

    Confirm the current number on the city's official site before relying on it, since departments and numbers change.

  2. Photograph the problem and write down the date

    Take the photos before any work starts.

  3. If the city sent a notice, note its deadline

    Write down the date it must be fixed by and exactly what it asks for.

Work through the full repair checklist

If the repair is yours to pay

Get more than one quote before you agree to a price, and ask the contractor to confirm where the property line and the public side begin.

Compare local pros on Angi

For concrete, yard, tree, and foundation work, get a few quotes first.

Partner link. Who Pays the Repair? may earn a commission if you request a quote or sign up, at no cost to you. It never changes who we say pays.

Responsibility Boundary

Default rule and exceptions

Birmingham General Code § 4-5-11 makes it unlawful for a property owner to let the abutting sidewalk remain in a broken, worn, damaged, defective, unsafe or dangerous condition. The City Engineer notices the owner to repair within 10 days (§ 4-5-12); on failure the City repairs and the council assesses the cost as a lien (§ 4-5-13).

PartyWhat they are responsible for
Property ownerDo not let the abutting sidewalk remain broken, damaged, defective or unsafe (§ 4-5-11); repair within 10 days of the City Engineer’s notice (§ 4-5-12). Keep it free of snow, sleet and ice (§ 4-5-10).
City / public agencyThe Public Works Construction Division is responsible for the maintenance and repair of City roadways and sidewalks and takes requests through the 311 portal. The City raised sidewalk spending to $1 million in November 2024 and approved $2 million more for sidewalk repairs on March 31, 2026. On owner default under the code, the City repairs and the council assesses the cost as a lien (§ 4-5-13).
ExceptionsThe City's pages do not say whether it still bills owners for sidewalk repairs. Ask through 311 first.

What the source says

Last verified against the primary source on Oct 3, 2026.

It shall be unlawful for any property owner to allow the sidewalk paving, portions of private driveways built within the public right-of-way, and any sidewalk openings ... located in such paved sidewalks in front, or along the side of his or her property to remain in a broken, worn, damaged or defective condition ... or to permit that sidewalk, driveway, sidewalk opening, streetscape or grass plot to remain in an unsafe or dangerous condition to the traveling public or pedestrians
Birmingham General Code § 4-5-11 (owner may not allow sidewalk to remain defective), checked Sep 9, 2026
It shall be the duty of every occupant or person in possession, charge or control of the ground floor or lower story of any house, building or structure ... situated on, abutting or facing any sidewalk ... to keep the sidewalk so abutting or bordering the premises, whether in front or on the side thereof, free from snow, sleet and ice, so as to afford a safe and convenient passage for pedestrians
Birmingham General Code § 4-5-10 (occupant duty to keep sidewalk free of snow, sleet, ice), checked Sep 9, 2026
It shall be the duty of the city engineer to give notice of any defective or dangerous condition of any sidewalk, sidewalk opening or vault ... which notice shall also require the property owner to repair or replace the same within ten days of the date of the notice
Birmingham Code of Ordinances § 4-5-11, checked Sep 27, 2026
The Construction Division of the Department of Public Works is responsible for the maintenance and repair of City roadways, sidewalks, curb & gutter, and storm drainage infrastructure.
Construction Operations Division, checked Oct 3, 2026
The Construction Division responds to citizen requests through the 311 portal.
Construction Operations Division, checked Oct 3, 2026
Sidewalk Repairs - $2 million: This project will supplement the existing sidewalk budgets to further sidewalk repairs across the city.
Mayor Woodfin focuses on Cradle to Career, Infrastructure in Budget Surplus Plan, checked Oct 3, 2026
The amended budget would increase sidewalk spending to $1 million, double funding for traffic calming measures, and add $1.25 million more for the demolition of blighted structures and weed abatement.
Mayor Woodfin Prioritizes Neighborhood Revitalization and Public Safety in Recommended Budget Amendments for Fiscal Year, checked Oct 3, 2026

Common questions

Who pays for sidewalk repair in Birmingham, AL?

It depends on the specific facts. Do not let the abutting sidewalk remain broken, damaged, defective or unsafe (§ 4-5-11); repair within 10 days of the City Engineer’s notice (§ 4-5-12). Keep it free of snow, sleet and ice (§ 4-5-10).

Are there exceptions in Birmingham, AL?

The City's pages do not say whether it still bills owners for sidewalk repairs. Ask through 311 first.

What is this based on for Birmingham, AL?

This verdict is sourced to Birmingham General Code § 4-5-11 (owner may not allow sidewalk to remain defective) and 7 sources in total, each independently re-checked before publication.

Sources

  1. Birmingham General Code § 4-5-11 (owner may not allow sidewalk to remain defective)official · verified-official · accessed 2026-09-09
  2. Birmingham General Code § 4-5-10 (occupant duty to keep sidewalk free of snow, sleet, ice)official · verified-official · accessed 2026-09-09
  3. Birmingham Code of Ordinances § 4-5-11ordinance · verified-primary · accessed 2026-09-27
  4. Construction Operations Divisionofficial · verified-official · accessed 2026-10-03
  5. Construction Operations Divisionofficial · verified-official · accessed 2026-10-03
  6. Mayor Woodfin focuses on Cradle to Career, Infrastructure in Budget Surplus Planofficial · verified-official · accessed 2026-10-03
  7. Mayor Woodfin Prioritizes Neighborhood Revitalization and Public Safety in Recommended Budget Amendments for Fiscal Yearofficial · verified-official · accessed 2026-10-03
Spot an error? Challenge this record

Found an out-of-date code section, a wrong verdict, or a better primary source? Tell us. Corrections that check out are applied, with the change shown in history. That is our standing policy.

Related records

More in Sidewalk Repair

All Sidewalk Repair records →