Boston, MA · Sewer Lateral

Sewer Lateral Repair in Boston, MA: Who Pays?

Who pays?
The property owner pays

Boston owners own the entire lateral from the basement to the main, but a BWSC grant can cover up to $8,000 for an 8-foot relay or $6,000 for a full lateral, once every 10 years.

High confidence · Verified Nov 2, 2026 · 3 sources

Exception
  • BWSC financial-assistance grant: up to $8,000 (8ft relay) or $6,000 (full replacement), once per 10 years
What to do next

What to do next

  1. Check with Boston before you hire anyone

    Public Works Department (also reachable via BOS:311)

    Call 617-635-4900Official page

    Confirm the current number on the city's official site before relying on it, since departments and numbers change.

  2. Check the cost help on record

    BWSC financial-assistance grant: up to $8,000 (8ft relay) or $6,000 (full replacement), once per 10 years Grant work must be completed within 30 days of the eligibility decision unless BWSC approves an extension, and the check (up to $8,000 or $6,000) is issued within 2 to 3 weeks. If the contractor only clears the line by power rodding or snaking, the owner pays all of that cost. A property is eligible once every 10 years. Questions about a BWSC letter: Engineering Planning, 617-989-7433.

  3. Photograph the problem and write down the date

    Take the photos before any work starts.

  4. If the city sent a notice, note its deadline

    Write down the date it must be fixed by and exactly what it asks for.

  5. A permit is required under the rule on record

    Ask whoever does the work who pulls it.

  6. If the repair is yours, get more than one written quote

    Ask each contractor to confirm where your part ends and the public part begins.

Work through the full repair checklist

Responsibility Boundary

Default rule and exceptions

Owner owns the full lateral from inside the basement to the BWSC main in the street. BWSC owns only the main. Repairs to private sewers must be made by a licensed drain layer, and a site plan is required for the repair or reconstruction of a building sewer that connects to the Commission's system. If a hired contractor cannot clear the blockage, the owner arranges a BWSC lateral inspection through Operations at 617-989-7900.

Permit required: yes.

PartyWhat they are responsible for
Property ownerBWSC: "property owners are responsible for all expenses resulting from maintenance and repair of their property's entire lateral from inside the property's basement to BWSC's sewer main in the street."
City / public agencyBWSC maintains its sewer main in the public way and offers a one-time grant "up to a maximum reimbursement of either $8,000 for an 8' relay or $6,000 for a full lateral line," once per 10 years.
ExceptionsBWSC financial-assistance grant: up to $8,000 (8ft relay) or $6,000 (full replacement), once per 10 years

What the source says

Last verified against the primary source on Nov 2, 2026.

While BWSC is responsible for maintaining its sewer main located in a public way, property owners are responsible for all expenses resulting from maintenance and repair of their property's entire lateral from inside the property's basement to BWSC's sewer main in the street.
Sewer Lateral Financial Assistance Program, checked Nov 2, 2026
Building sewers and building storm drains, whether located on public or private property, are owned by the owner of the premises served.
Regulations Governing the Use of Sanitary and Storm Sewers, Section 7(a), checked Nov 2, 2026
BWSC may provide a one-time grant (up to a maximum reimbursement of either $8,000 for an 8' relay or $6,000 for a full lateral line)
Sewer Lateral Financial Assistance, checked Nov 2, 2026
property owners are responsible for all expenses resulting from maintenance and repair of their property's entire lateral from inside the basement to BWSC's sewer main in the street.
Sewer Lateral Financial Assistance, checked Nov 2, 2026
BWSC may provide a one-time grant (up to a maximum reimbursement of either $8,000 for an 8' relay or $6,000 for a full lateral line) to property owners who meet the eligibility criteria.
Sewer Lateral Financial Assistance, checked Nov 2, 2026
The building has not participated in the program in the last 10 years
Sewer Lateral Financial Assistance, checked Nov 2, 2026
If the licensed and bonded contractor hired is unable to clear the blockage, the property owner needs to arrange a meeting between the contractor and BWSC to verify the blockage or collapse by calling Operations at 617-989-7900 to schedule a lateral inspection appointment
Sewer Lateral Financial Assistance, checked Nov 2, 2026
If the property owner receives a letter, please contact Engineering Planning at 617-989-7433
Sewer Lateral Financial Assistance, checked Nov 2, 2026
A Site Plan is required by the Commission for review and approval of a proposed connection, or reconstruction, repair or modification of an existing building sewer or building storm drain which connects to the Commission's sewer or storm drainage system.
Sewer Use Regulations, checked Nov 2, 2026
Repairs to private sewers in the City, including repairs required to comply with these Regulations, shall be made by a licensed drain layer.
Sewer Use Regulations, checked Nov 2, 2026
All work must be completed within 30 days of the determination of eligibility, unless an extension is approved by BWSC
Sewer Lateral Financial Assistance, checked Nov 2, 2026
A check in the amount not to exceed the authorized $8,000.00 or $6,000 will then be issued to the property owner within 2 - 3 weeks
Sewer Lateral Financial Assistance, checked Nov 2, 2026
If the contractor clears the line through power rodding or snaking, the property owner is responsible for all expenses incurred in clearing the blockage
Sewer Lateral Financial Assistance, checked Nov 2, 2026
A property is eligible only once every 10 years for the Sewer Lateral Financial Assistance Program
Sewer Lateral Financial Assistance, checked Nov 2, 2026

Common questions

Who pays for sewer lateral in Boston, MA?

The property owner. BWSC: "property owners are responsible for all expenses resulting from maintenance and repair of their property's entire lateral from inside the property's basement to BWSC's sewer main in the street."

What does the city cover in Boston, MA?

BWSC maintains its sewer main in the public way and offers a one-time grant "up to a maximum reimbursement of either $8,000 for an 8' relay or $6,000 for a full lateral line," once per 10 years.

Do I need a permit to repair the sidewalk in Boston, MA?

Yes. The rule on record requires a permit for sidewalk work in the public right-of-way.

Are there exceptions in Boston, MA?

BWSC financial-assistance grant: up to $8,000 (8ft relay) or $6,000 (full replacement), once per 10 years

Is there any cost help for sewer lateral in Boston, MA?

BWSC financial-assistance grant: up to $8,000 (8ft relay) or $6,000 (full replacement), once per 10 years Grant work must be completed within 30 days of the eligibility decision unless BWSC approves an extension, and the check (up to $8,000 or $6,000) is issued within 2 to 3 weeks. If the contractor only clears the line by power rodding or snaking, the owner pays all of that cost. A property is eligible once every 10 years. Questions about a BWSC letter: Engineering Planning, 617-989-7433.

Sources

  1. Sewer Lateral Financial Assistance Programofficial-guide · verified-primary · accessed 2026-11-02
  2. Regulations Governing the Use of Sanitary and Storm Sewers, Section 7(a)ordinance · verified-primary · accessed 2026-11-02
  3. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  4. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  5. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  6. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  7. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  8. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  9. Sewer Use Regulationsofficial-code · verified-primary · accessed 2026-11-02
  10. Sewer Use Regulationsofficial-code · verified-primary · accessed 2026-11-02
  11. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  12. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  13. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02
  14. Sewer Lateral Financial Assistanceofficial-guide · verified-primary · accessed 2026-11-02

If the repair is yours to pay

Get more than one quote before you agree to a price, and ask the contractor to confirm where the property line and the public side begin.

Compare licensed plumbers on Angi

Get more than one quote before a sewer, water-line, or drain repair.

See what a home warranty covers (Choice)

Read the coverage and exclusions before you buy; not every repair qualifies.

Partner link. Who Pays the Repair? may earn a commission if you request a quote or sign up, at no cost to you. It never changes who we say pays.

Spot an error? Challenge this record

Found an out-of-date code section, a wrong verdict, or a better primary source? Tell us. Corrections that check out are applied, with the change shown in history. That is our standing policy.

Same city

Other repair responsibilities in Boston, MA

Every verified repair rule for Boston, on one page →

Every verified rule in MA, city by city, in one table →

Related records

More in Sewer Lateral

All Sewer Lateral records →